Identify the installed battery
Match the configuration record, production data and diagnostic identifiers. Official PHEV material lists different battery capacities across versions; the EV route must be checked against its own current document.
ENERGY / FIELD NOTE 06

CONNECTED DECISIONS
A Tai 7 EV Flash-Charging candidate also needs the version-specific charge-curve and route test. After rough use, add the underbody and water-exposure inspection. Inspect the physical connection through the charge-inlet, lock and water checks. Include the property-side scope in your home AC charging plan. For supported external power, assess V2L camping equipment and loads.
Match the configuration record, production data and diagnostic identifiers. Official PHEV material lists different battery capacities across versions; the EV route must be checked against its own current document.
Capture faults, temperature spread, state-of-charge behaviour, cell or block data available through approved diagnostics, and charge performance under stated conditions. Note ambient temperature and vehicle load.
Where fitted, test AC and DC charging with compatible equipment. Save start and end state of charge, delivered energy, time, peak or stable power, interruptions and warning messages.
Check the enclosure, guards, mounting points, coolant circuits, charge inlet, cables and signs of impact, water or unauthorized repair. A clean dashboard does not rule out physical damage.
Confirm voltage, frequency, plug, communication protocol, public-network access, adapter legality and service support. Put any required portable equipment and its rating into the shipment inventory.
HANDOVER FILE
BUYER SCENARIO
Ask the candidate to complete a documented charge rather than displaying an estimated range screen. Record the charger, ambient temperature, starting and ending state, energy delivered, time and interruptions. Repeat enough of the test to separate a site-side fault from a vehicle-side fault. A connector adapter should not be accepted until its rating, communication and destination legality are understood.
Stress the result by assuming “Test both charging paths” reveals a conflict, “Inspect thermal and physical condition” is delayed, or “Map destination compatibility” changes before custody. Rework the cost, timing and stop condition using AC/DC charge log, underbody and inlet photographs, destination charger test or written compatibility. A different VIN, propulsion route or installed configuration starts a new candidate record. The conclusion for Fangchengbao Tai 7 Battery and Charging Guide must explain how battery and vehicle identifiers and dated diagnostic report support or limit the selected route.
CLOSE THE FILE
For Fangchengbao Tai 7 Battery and Charging Guide, reconcile battery and vehicle identifiers, dated diagnostic report, AC/DC charge log, underbody and inlet photographs, destination charger test or written compatibility. Mark each item verified, seller-stated, estimated or unresolved, and put a responsible person and expiry date beside the open work. Keep commercial rows separate so a change in one assumption does not silently rewrite the whole conclusion.
Immediately before payment or handover, repeat “Identify the installed battery” and confirm that the candidate still matches the reviewed record. Preserve the VIN, odometer, visible condition, keys, documents and relevant energy state. If the vehicle or a material specification changes, close this file and begin a new one.
OFFICIAL REFERENCE BOUNDARY
Fangchengbao may revise equipment, software and specifications. Match official information to the production record and actual installed hardware. Review the official Fangchengbao Tai 7 reference, then verify the candidate and destination independently.