Survey the route first
Record surface, gradient, side slope, water, mud, sand, snow, temperature, remoteness and communications. Identify turn-around points and conditions that cancel the trip.
CAPABILITY / FIELD NOTE 23

Record surface, gradient, side slope, water, mud, sand, snow, temperature, remoteness and communications. Identify turn-around points and conditions that cancel the trip.
Confirm tyre type, age, pressure range, spare or repair provision and availability. Inspect low points, battery protection, bumpers, steps and accessories that affect approach or breakover.
Read the correct manual for terrain, crawl, turn or suspension functions fitted to the version. Electronic assistance cannot create grip and may have speed, surface or temperature limits.
Avoid assuming a marketing water or terrain statement applies to a modified, damaged or aged vehicle. Inspect seals, guards and connectors, and follow recovery and post-exposure procedures.
Define rated points, equipment, trained helpers, towing restrictions, energy reserve, alternative route and emergency contact. Never attach recovery equipment to an unverified point.
HANDOVER FILE
BUYER SCENARIO
Set a turn-around condition before entering the route: water above a verified limit, loss of communications, tyre damage without a safe spare, or energy reserve below the recovery margin. Check that every recovery point and towing method is approved for the exact vehicle. Terrain modes assist the driver; they do not replace route assessment, grip, clearance or a safe exit plan.
Stress the result by assuming “Understand mode limits” reveals a conflict, “Protect electrified systems” is delayed, or “Carry a recovery plan” changes before custody. Rework the cost, timing and stop condition using version-specific operating manual, underbody/high-voltage condition, rated recovery procedure. A different VIN, propulsion route or installed configuration starts a new candidate record. The conclusion for Fangchengbao Tai 7 Terrain and Route Planning must explain how route and weather plan and tyre and clearance inspection support or limit the selected route.
CLOSE THE FILE
For Fangchengbao Tai 7 Terrain and Route Planning, reconcile route and weather plan, tyre and clearance inspection, version-specific operating manual, underbody/high-voltage condition, rated recovery procedure. Mark each item verified, seller-stated, estimated or unresolved, and put a responsible person and expiry date beside the open work. Keep commercial rows separate so a change in one assumption does not silently rewrite the whole conclusion.
Immediately before payment or handover, repeat “Survey the route first” and confirm that the candidate still matches the reviewed record. Preserve the VIN, odometer, visible condition, keys, documents and relevant energy state. If the vehicle or a material specification changes, close this file and begin a new one.
OFFICIAL REFERENCE BOUNDARY
Fangchengbao may revise equipment, software and specifications. Match official information to the production record and actual installed hardware. Review the official Fangchengbao Tai 7 reference, then verify the candidate and destination independently.